b'88 89CANADIAN TIRESASKTEL DATA CENTREDISTRIBUTION PLANTSThis contract included approximately 25 separate projectsStephenson Engineering provided full structural services for over a multi-year timeframe. this new 25,000 SF data centre. The building is predominantly Canadian Tire contracted Stephenson Engineering to com- a single story building with a 1,000 SF Mezzanine structure plete renovations to a number of their distribution plantsfor Kyoto units. The building is divided between the Data including modifications to new and existing conveyors andRoom, offices, electrical and mechanical equipment rooms.automated high-rise racking systems.Due to the challenging soil conditions, the ground floor slab A critical part of our scope was working as closely as possibleis suspended on drilled friction caissons. with the material handling vendor to ensure that the revisedThe roof structure is split into two levels. There is a low roof systems did not overload the capacity of the existing structure. over the offices and a high roof over the Data room, the Kyoto Mezzanine, electrical and mechanical rooms. The steel structure for the roof consists of long span joists over the Data room to maimize the clear area and minimize the weight. There are steel beams and columns for the other areas. The roof supports two air handling units in addition to the hanging services. Client: Canadian Tire Client: Urbacon Ltd.Location: Various Locations Across Canada Location: Regina, SaskatchewanSTEPHENSON ENGINEERING LIGHT INDUSTRIAL 05.5'